Brewery Upgrade: HERMS System (Part 2)
The PID control box and temperature probe are ready (see part 1 here). The next jobs I need to complete are: Fit a heating element to the asparagus pot Make a copper pipe coil Install fittings for the pipe work Test everything! So, next up is setting up the pot that’s going to hold my warm water and act as the heat exchanger. The parts I used are: 3 Litre Asparagus Steamer 1500W Kettle Element The steamer is basically just…