Brewery Upgrade: HERMS System (Part 3)
The PID control box, temperature probe, and the water heating pot are ready (see parts one and two). The remaining jobs I need to complete are: Make a copper pipe coil Install fittings for the pipe work Test everything! So, next up is some copper bending! The parts used here are: 3 meters of 12mm copper pipe Kids play sand 2 x 1/2″ / 12mm compression fittings 1/2″ Tee piece A 500ml beer bottle I first tried to bend the…