Brewery Upgrade: HERMS System (Part 4)
The PID control box, temperature probe, water heating pot and the re-circulation coil are ready (see parts one, two and three). The remaining jobs I need to complete are: Install fittings for the pipe work Test everything! The parts used here are: PT100 temperature probe with 1/4″ BSP fitting 1/2″ to 1/4″ BSP Reducing bush 1/2″ BSP female nipple 2 x 1/2″ Camlock Type F fittings 2 x 1/2″ Camlock Type C fittings 2 x hose clips 0.5m silicone hose I…